Beginning repairs
Removing bed sides for repair
Fiberglass repair complete on left bed panel. Glaze coat applied
Completing fiberglass repairs to right bed side. Reattaching front mount panel.
Glass repairs complete. Primer coat applied. Beginning block sanding/ prep for painting
Refinishing complete. Will need to allow the panels to air dry as opposed to baking the finish due to the porosity of the panels.
Cab trim panel removed. Air ride system repairs in process
Air ride repairs complete. Removing the trim cap adhesive from the cab
Trim cap re-installed. Re-installing bed sides
Put together complete. Beginning final clean up
Repairs complete!!
9843 Titan Court • Littleton, CO • 80125