Home

Photos

Beginning repairs
Removing parts and trim for repairs
Parts and trim removed. Beginning stripping of the damaged paint. **Removal of the flat bed and tool boxes will be necessary to perform quality paint work on the back of the cab. Beginning removal
Flat bed removed. Sheet metal repairs in process
Sheet metal repairs complete. Prepping for primer coat
Interior/ glass removed
New receiver installed
Primer coat applied. Beginning block sanding.
Rear frame blacked out
Refinishing of hood complete. Continuing prep on cab
Cab painting complete. (We sprayed the back panel also, although not included in the bid) Polishing in process
Polishing complete. Put together of cab near complete. On hold for replacement grille. The 1st aftermarket is defective
New bed delivered
Installing the new bed
Bed install near complete. Painting mount brackets at welds prior to completing wiring of the clearance and tail lamps.
<p>New under bed tool boxes mounted</p>
303.791.3389
9843 Titan Court • Littleton, CO • 80125